Application

Application of monoblock sealer should be carried out wearing protective goggles, boots and appropriate clothing. For optimium results apply two coats of monoblock sealer, leaving approx 2 hours drying time between coats. For borders areas a large paint brush or small roller should be used to minimise overspill 

MONOBLOCK SEALER- Application Guidelines:

Smartseal monoblock sealer is best applied by a selar sprayer or large long handled roller kit. To ensure all sanded monoblock joints are properly sealed apply at a rate of 2- 2.5m2 per litre first coat (dependent on type of monoblock), and approx 3.5- 4 m2 per litre second coat. Once the two coat application is complete the monoblock sealer will be touch dry within 2 hours at 20°C and suitable for foot traffic. note *all vehicles should be kept off the paving for a minimum of 24 hours at 20°C.

PLEASE NOTE: These time frames may be change depending on the ambient temperature and weather conditions on any given day.

By it's nature Smartseal monoblock sealer will give many years of protection, but just like any other external surface exposed to the weather in Scotland a regular top up coat of monoblock sealer every few years is advised. Visit our monoblock maintainence page for more details.

Please contact us online if you require further information regarding applying monoblock sealer or call 0800 988 0348